Penans
intensifies blockade on Murum dam construction
Murum, Belaga (5 Oct): The Penans are intensifying their
blockade on Murum dam construction and against the Sarawak Energy Berhad with
another linkage road to the dam site being blockaded yesterday. The road is going through an oil palm
plantation, was a narrow old logging road and passable by four-wheel drive
vehicle only. Sarawak Energy Berhad (SEB) is using the road as an alternative
route to the dam site for the past 3 days.
Penans inside their hut while manning their blockade |
The number of Penans involved
in the blockade has increased from 200 to 320 that comprised of people from
eight Penan villages and a Kenyah-Badeng village of Long Umpa near Long Malim
in Danum River. Within these few days more Penans are expected to join as most
of them have completed planting their hill paddy farms.
The Penans are setting up camps
around the blockade site at Seping River Bridge, about 40 Km from Murum
Hydroelectric dam project site. Their makeshift huts “sulap” covered
with wild-ginger and palm leaves as well as plastic canvases are seen around the area. Those families
came with their babies, children and elderly parents are occupying an old
logging camp workshop nearby the site.
Some of them made their huts using the deposed old zinc sheets that they
managed to salvage at the old logging camp site.
A young mother nursed her 2 months old baby near the blockade site |
Labang Paneh, a representative from Long Wat village stated that the blockade is a collective action of all the Penan villages affected by the construction of Murum dam project. “We will not remove the blockade or move out of here until our demands are resolved and fulfilled by the government”, he said.
The Village Head of Long Wat, Pinang Bo blamed the Sarawak Energy Berhad (SEB) for being disrespectful to the customs of the Penan community in Murum area. He said that SEB has intentionally destroying the most important Penan’s scared and historical sites of Batu Tungun, Batu Pebin and Batu Aseu at the project site and with lots more will be destroyed in due time by the construction of the dam.
The Penans reported that the China’s Three Gorges Project Corporation and its Chinese contractor companies have told their Chinese workers not to leave their camps and the Murum dam construction site for fearing of safety and of any untoward incident with the locals.
As to maintain security, peace
and order at the project area, the government has deployed some at least 20
police personnel from the General Armed Forces to the blockade site. Some of
these police were stationed at the Murum dam construction site.
The blockade has entered its
tenth day since it was started on 26th September by the Penans from the villages of Long
Wat, Long Luar, Long Tangau, Long Menapa, Long Singu and Long Malim, Long Peran
and Long Jaik villages together with a Kenyah-Badeng village of Long Umpa.
Raymond Abin, National Coordinator of Sarawak Conservation Alliance for Natural Environment (SCANE) said, the Penan communities are protesting against
the negligence of the government to act and respond to their issues, problems
and demands with regard to the construction of Murum dam project. "They are also
protesting against Sarawak Energy Berhad for being disrespectful to their
customs by destroying their scared and historical sites without their consent", he added.
The Sarawak Energy Berhad which is Sarawak
Government owned Private Corporation has awarded the contract work of the Murum
dam project to China’s Three Gorges Project Corporation for an estimated cost
of RM3 billion.
The progress of the construction work on the
major structures of the dam is about 70% completed. When completed, the Murum
dam will flood about 24,500 hectares of native customary rights land and forest
of the Penan villages. The dam catchment area is 275,000 hectares which
comprises of mainly Pelieran River, Danum River and Usun Apau Plateau, the
ancestral land of the indigenous communities in Sarawak.
The Murum dam project is scheduled to be ready
by 2013.
No comments:
Post a Comment